Leverett Rd. is Scheduled to be Paved mid-September

Yesterday, 8/30/18, sections of Leverett Rd. were prepared for paving. The roadway is rougher than normal. The old top layer was ground down. The black top will be applied in about two weeks from now. The highway dept. will notify the public of the exact date when it is verified.